top of page

Renewable wind and solar optimisation to get double

wind power doubler for slow drifts every 10 mins

loop{

{

a=powermeter(read)

rotate(5 deg positive)

if increment by 10 % exit loop

else


a=powermeter(read)

rotate(10 deg negetive)

if increment by 10 % exit loop

else


rotate(5 deg positive to come to zero degree)

}

delay 10 mins

}



..,......


loop{

motor on at 180 deg rotation per 12 hrs motor

delay (12 hrs)

rewind at 180 deg rotation per min with high current

delay(1 min)

delay (12) hr idle


ideal solar terrestial code..


just 200 re Arduino chip with pwm and h bridge..



Recent Posts

See All
How the adventure began

[10/25, 12:54] harish ravishankar: Saw html middle of class x1 instead of right click open text file of saved random page in class 7 [10/25, 12:59] harish ravishankar: That shifted interest to physics

 
 
 

Comments


bottom of page